The APC NetShelter Rack PDU Advanced Metered Outlet 17.3kW 3-Phase from Schneider Electric is enterprise-grade Rack PDUs hardware built for data centers. The APC NetShelter Advanced Metered Outlet Rack PDU (APDU10350SM) is a 3-phase, 17.3 kW intelligent power distribution unit engineered for high-density data center and enterprise rack environments. Built on Schneider Electric's NetShelter platform, it delivers per-outlet current metering alongside branch circuit and total-unit monitoring, giving operations teams granular, real-time visibility into rack-level power consumption without requiring supplemental metering hardware. Available in brand new condition. Schneider Electric rack pdus products are trusted by enterprises and data centers worldwide. Available from Omnixon Global. Contact our sales team to request a quote.

Technical Specifications

BrandSchneider Electric
CategoryRack PDUs
SKUSCHN-APDU10350SM
Part NumberAPDU10350SM
ConditionNew
Form FactorRack
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery

Frequently Asked Questions about APC NetShelter Rack PDU Advanced Metered Outlet 17.3kW 3-Phase

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.