The APC NetShelter Rack PDU Advanced Metered Outlet 17.3kW 3-Phase from Schneider Electric is enterprise-grade Rack PDUs hardware built for data centers. The APC NetShelter Advanced Metered Outlet Rack PDU (APDU10350SM) is a 3-phase, 17.3 kW intelligent power distribution unit engineered for high-density data center and enterprise rack environments. Built on Schneider Electric's NetShelter platform, it delivers per-outlet current metering alongside branch circuit and total-unit monitoring, giving operations teams granular, real-time visibility into rack-level power consumption without requiring supplemental metering hardware. Available in brand new condition. Schneider Electric rack pdus products are trusted by enterprises and data centers worldwide. Available from Omnixon Global. Contact our sales team to request a quote.
| Brand | Schneider Electric |
| Category | Rack PDUs |
| SKU | SCHN-APDU10350SM |
| Part Number | APDU10350SM |
| Condition | New |
| Form Factor | Rack |
| Battery | Sealed lead-acid or Li-ion (model-dependent) |
| Communication | USB, RS-232, SNMP / NMC card |
| Warranty | 2-3 year electronics + 2 year battery |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.