About the APC NetShelter Rack PDU Advanced Metered Outlet 17.3kW 3-Phase

The NetShelter APDU10350SM delivers 17.3kW 3-phase advanced metered outlet-level PDU control for high-density datacenter rack power visibility.

At a glance — key specifications

Form FactorRack
Part NumberAPDU10350SM
ManufacturerSchneider Electric
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery

Perfect for

  • Server racks (single or paired)
  • Network and storage closets
  • Edge / branch IT
  • Small to mid-size datacentre rooms
  • Critical workstations and lab equipment

Why buy the APC NetShelter Rack PDU Advanced Metered Outlet 17.3kW 3-Phase from Omnixon Global

  • Authorised distribution only — 100% authentic Schneider Electric hardware, serial-number registrable, warranty processes cleanly with the manufacturer.
  • Dubai-based logistics hub — same-day delivery within Dubai for in-stock SKUs, courier-cleared delivery across UAE, Saudi Arabia, Qatar, Kuwait, Oman, Bahrain, plus broader EMEA + APAC.
  • 24-hour RFQ turn-around — submit your part numbers and quantities, get channel-direct pricing and confirmed availability the next business day.
  • Pre-sales engineering on call — multilingual (English / Arabic / Persian / Russian) pre-sales engineers help with sizing, configuration, BOM validation, and compatibility checks at no charge.
  • Post-sale support attach — manufacturer support contracts (Dell ProSupport, HPE Foundation Care, Lenovo Premier, Cisco SmartNet, Aruba Care, Juniper J-Care) bundled at quote time.
  • Worldwide shipping — air, sea, courier express, with all customs documentation handled by our logistics team.

Frequently asked questions

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.

Request a quote for the APC NetShelter Rack PDU Advanced Metered Outlet 17.3kW 3-Phase

Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.

Request a Quote →

Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.

Technical Specifications

BrandSchneider Electric
CategoryRack PDUs
SKUSCHN-APDU10350SM
Part NumberAPDU10350SM
ConditionNew
Form FactorRack
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery
Manufacturer Part NumberAPDU10350SM
Power Rating17.3 kW
Power Configuration3-Phase
Voltage208V or 230V (configuration-dependent)
Outlet Count30 metered outlets
InterfaceIEC 60309 3-phase inlet, C13/C19 outlets
Metering CapabilityAdvanced per-outlet metering and monitoring
ManagementNetwork management card with SNMP, HTTP/HTTPS
Security FeaturesOutlet-level access control, user authentication
Operating Temperature0–50°C
Rack Units2U
ComplianceUL, CE, IEC standards

Frequently Asked Questions about APC NetShelter Rack PDU Advanced Metered Outlet 17.3kW 3-Phase

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.