Brand: Vertiv | Category: UPS & Power Protection
SKU: EXS010KHB1102C20 | Part #: EXS010KHB1102C20 | MPN: EXS010KHB1102C20
Contact for Pricing — Request a Quote
The Liebert EXS 10kVA 3-phase UPS delivers online double-conversion protection scaled for edge cabinets and small datacentre rooms.
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.
Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.
Request a Quote →Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.
| Brand | Vertiv |
| Category | UPS & Power Protection |
| SKU | EXS010KHB1102C20 |
| Part Number | EXS010KHB1102C20 |
| Condition | New |
| Capacity | 10kVA |
| Battery | Sealed lead-acid or Li-ion (model-dependent) |
| Communication | USB, RS-232, SNMP / NMC card |
| Warranty | 2-3 year electronics + 2 year battery |
| Manufacturer Part Number | EXS010KHB1102C20 |
| Battery Type | Sealed lead-acid or Li-ion (model-dependent) |
| Output Power | 8kW (at 0.8 power factor) |
| Communication Interfaces | USB, RS-232, SNMP / NMC card |
| Input Voltage | 400V AC 3-phase |
| Output Voltage | 400V AC 3-phase |
| Form Factor | Floor-standing |
| Topology | Double conversion (VFI) |
| Operating Temperature Range | 0–40°C |
| Efficiency (AC-in to AC-out) | ≥92% (typical) |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.