Vertiv Liebert EXM2 225kVA UPS

Vertiv Liebert EXM2 225kVA UPS

Brand: Vertiv | Category: UPS & Power Protection

SKU: EXM2-225KVA-480V | Part #: EXM2-225KVA-480V | MPN: EXM2-225KVA-480V

Contact for Pricing — Request a Quote

Request a Quote Contact Us

About the Vertiv Liebert EXM2 225kVA UPS

The Vertiv Liebert EXM2 225kVA UPS (part number EXM2-225KVA-480V) accepts 480V three-phase input and delivers 480V three-phase output, supporting both 50/60 Hz auto-sensing input frequency with synchronized or free-running output frequency control. This enterprise-grade double-conversion online UPS system is engineered for data centers, mission-critical facilities, and IT infrastructure teams requiring continuous power protection without compromise.

Vertiv's EXM2 series combines industry-leading efficiency with robust fault tolerance. Operating at up to 96% efficiency in double-conversion mode and up to 99% in Economy/ECO mode, the unit minimizes operational costs while maintaining zero-millisecond transfer time to battery during utility interruptions. With an input power factor of ≥0.99 at full load and input current THD below 3% thanks to an IGBT active front-end rectifier, this UPS reduces strain on electrical infrastructure. The system supports 125% overload capacity for 10 minutes and 150% for 60 seconds, providing headroom for transient demand spikes. Static bypass with manual maintenance bypass ensures service continuity during routine maintenance. Network managers and IT procurement teams benefit from multi-protocol communication via SNMP, Modbus RTU/TCP, BACnet, and dry contacts, enabling seamless integration into existing management ecosystems. The EXM2-225KVA-480V delivers 225 kVA / 202.5 kW with a 0.9 output power factor, making it ideal for mixed resistive and reactive loads typical in enterprise environments.

Key Specifications

  • Manufacturer: Vertiv
  • Model: Liebert EXM2
  • UPS Capacity: 225 kVA / 202.5 kW
  • Topology: Double-Conversion Online (VFI)
  • Input/Output Voltage: 480V three-phase
  • Online Mode Efficiency: Up to 96%; ECO Mode Efficiency: Up to 99%
  • Communication Interfaces: SNMP, Modbus RTU/TCP, BACnet, dry contacts

For technical specifications, pricing, and availability of the EXM2-225KVA-480V, please submit a request for quotation (RFQ) through Omnixon Global.

Technical Specifications

BrandVertiv
CategoryUPS & Power Protection
SKUEXM2-225KVA-480V
Part NumberEXM2-225KVA-480V
ConditionNew
ModelLiebert EXM2
Manufacturer Part NumberEXM2-225KVA-480V
UPS TopologyDouble-Conversion Online (VFI)
UPS Capacity225 kVA / 202.5 kW
Output Power Factor0.9
Input Voltage480V three-phase
Output Voltage480V three-phase
Input Frequency50/60 Hz (auto-sensing)
Output Frequency50 or 60 Hz (synchronized to input or free-running)
Input Power Factor≥ 0.99 at full load
Input Current THD< 3% at full load (IGBT active front-end rectifier)
Efficiency (Online Mode)Up to 96% in double-conversion mode
Efficiency (ECO Mode)Up to 99% in Economy/ECO mode
Overload Capacity125% for 10 minutes; 150% for 60 seconds
Transfer Time (to Battery)0 ms (continuous online operation)
Transfer Time (to Bypass)< 20 ms (static bypass)
BypassStatic bypass with manual maintenance bypass
Communication InterfacesSNMP, Modbus RTU/TCP, BACnet, dry contacts
Cooling MethodForced air cooling with internal fans
Operating Temperature0°C to 40°C
Relative Humidity5% to 95% non-condensing
Standards ComplianceIEC 62040-1, IEC 62040-2, IEC 62040-3 (VFI-SS-111)

Frequently Asked Questions about Vertiv Liebert EXM2 225kVA UPS

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.