Huawei UPS5000-E-400K Modular UPS

Huawei UPS5000-E-400K Modular UPS

Brand: Huawei | Category: UPS & Power Protection

SKU: UPS5000-E-400K | Part #: UPS5000-E-400K | MPN: UPS5000-E-400K

Contact for Pricing — Request a Quote

Request a Quote Contact Us

About the Huawei UPS5000-E-400K Modular UPS

The Huawei UPS5000-E-400K Modular UPS delivers 400 kVA and 400 kW of continuous output power, engineered as an online double-conversion system that maintains uninterrupted power delivery to mission-critical enterprise infrastructure. This modular architecture supports N+X redundancy, enabling IT procurement teams and infrastructure managers to scale protection without replacing core hardware, while achieving up to 96% efficiency in normal operation and up to 99% in ECO mode.

Built to Huawei's proven standards compliance—IEC 62040-1, IEC 62040-2, and IEC 62040-3—the UPS5000-E-400K accepts 3-phase input voltage of 380/400/415 V AC across a wide input range of 138 V to 485 V AC, accommodating diverse regional power conditions across the MENA region and beyond. The unit synchronizes output frequency to the input (50 Hz or 60 Hz configurable) with zero millisecond transfer time to bypass mode, ensuring voltage regulation within ±1% static tolerance. Communication intelligence includes SNMP, RS485, and dry contact interfaces for seamless integration into centralized monitoring ecosystems, while operating reliably between 0 °C to 40 °C in humidity environments from 5% to 95% non-condensing.

Enterprise Deployment Scenarios

  • Data center power redundancy for large-scale server environments requiring sustained 400 kW protection with hot-swap module replacement
  • Modular expansion strategies where IT teams add capacity incrementally without single-point-of-failure risk
  • Mission-critical telecommunications facilities demanding VFI topology with synchronized output frequency and zero-transfer-time failover
  • Industrial and manufacturing facilities operating across variable input voltage ranges (138 V–485 V AC) with strict output voltage stability
  • Smart building and enterprise campus infrastructure where SNMP and RS485 connectivity enable remote health monitoring and predictive maintenance

For detailed specifications on the Huawei UPS5000-E-400K (part number UPS5000-E-400K) and to request a formal quotation, contact the Omnixon Global technical team today.

Technical Specifications

BrandHuawei
CategoryUPS & Power Protection
SKUUPS5000-E-400K
Part NumberUPS5000-E-400K
ConditionNew
Manufacturer Part NumberUPS5000-E-400K
TopologyOnline Double-Conversion (VFI)
Rated Capacity400 kVA / 400 kW
Power Factor (Output)1.0
Efficiency (Normal Mode)Up to 96%
Efficiency (ECO Mode)Up to 99%
Input Voltage3-phase, 380/400/415 V AC (configurable)
Input Voltage Range138 V – 485 V AC (wide input)
Input Power Factor≥ 0.99 at full load
Input Frequency Range45 Hz – 65 Hz
Output Voltage380/400/415 V AC, 3-phase
Output Voltage Regulation (Static)± 1%
Output Frequency50 Hz or 60 Hz (synchronized to input or free-running)
Transfer Time (Online to Bypass)0 ms
ArchitectureHot-swap modular; supports N+X redundancy
Communication InterfacesSNMP, RS485, dry contact (configurable)
Operating Temperature0 °C to 40 °C
Relative Humidity (Operating)5% – 95% non-condensing
Standards ComplianceIEC 62040-1, IEC 62040-2, IEC 62040-3
Battery ManagementIntelligent battery management with state-of-health monitoring and temperature-compensated charging

Frequently Asked Questions about Huawei UPS5000-E-400K Modular UPS

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.