Brand: Eaton | Category: Rack PDUs
SKU: ESAB30 | Part #: ESAB30 | MPN: ESAB30
Contact for Pricing — Request a Quote
The Eaton ESAB30 G4 ePDU Switched provides 0U, 208V 30A power with per-outlet switching across 24 C13 and 6 C19 receptacles for granular load control.
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.
Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.
Request a Quote →Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.
| Brand | Eaton |
| Category | Rack PDUs |
| SKU | ESAB30 |
| Part Number | ESAB30 |
| Condition | New |
| Battery | Sealed lead-acid or Li-ion (model-dependent) |
| Communication | USB, RS-232, SNMP / NMC card |
| Warranty | 2-3 year electronics + 2 year battery |
| Manufacturer Part Number | ESAB30 |
| Product Type | Switched Rack PDU |
| Form Factor | 0U Rack |
| Input Voltage | 208V AC three-phase |
| Input Connector | L6-30P |
| Rated Current | 30A |
| Outlet Count | 30 outlets |
| Outlet Configuration | (24)C13 and (6)C19 |
| Communication Interface | USB, RS-232, Ethernet, SNMP |
| Switched Outlet Control | Individual outlet on/off switching via management interface |
| Operating Temperature | 0–40°C |
| Humidity Range | 10–90% non-condensing |
| Dimensions | 1.75 x 44 x 3.5 inches |
| Weight | 8.5 kg |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.