About the HPE G2 Metered 3-Phase 22kVA 60A 480V 48-Outlet Rack PDU

The HPE G2 AF525A delivers 22kVA 3-phase metered power across 48 outlets, purpose-built for high-density enterprise rack environments at 480V.

At a glance — key specifications

Capacity22kVA
Form FactorRack
Part NumberAF525A
ManufacturerHPE
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery

Perfect for

  • Server racks (single or paired)
  • Network and storage closets
  • Edge / branch IT
  • Small to mid-size datacentre rooms
  • Critical workstations and lab equipment

Why buy the HPE G2 Metered 3-Phase 22kVA 60A 480V 48-Outlet Rack PDU from Omnixon Global

  • Authorised distribution only — 100% authentic HPE hardware, serial-number registrable, warranty processes cleanly with the manufacturer.
  • Dubai-based logistics hub — same-day delivery within Dubai for in-stock SKUs, courier-cleared delivery across UAE, Saudi Arabia, Qatar, Kuwait, Oman, Bahrain, plus broader EMEA + APAC.
  • 24-hour RFQ turn-around — submit your part numbers and quantities, get channel-direct pricing and confirmed availability the next business day.
  • Pre-sales engineering on call — multilingual (English / Arabic / Persian / Russian) pre-sales engineers help with sizing, configuration, BOM validation, and compatibility checks at no charge.
  • Post-sale support attach — manufacturer support contracts (Dell ProSupport, HPE Foundation Care, Lenovo Premier, Cisco SmartNet, Aruba Care, Juniper J-Care) bundled at quote time.
  • Worldwide shipping — air, sea, courier express, with all customs documentation handled by our logistics team.

Frequently asked questions

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.

Request a quote for the HPE G2 Metered 3-Phase 22kVA 60A 480V 48-Outlet Rack PDU

Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.

Request a Quote →

Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.

Technical Specifications

BrandHPE
CategoryRack PDUs
SKUAF525A
Part NumberAF525A
ConditionNew
Capacity22kVA
Form FactorRack
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery
Manufacturer Part NumberAF525A
Input Configuration3-phase 480V
Input Current60A
Output Outlets48 (IEC C13/C19)
Network ManagementSNMP, NMC card option
Serial InterfaceRS-232
USB PortYes
Metering TypeMetered by outlet
Power Distribution TypeMetered PDU
Voltage Phase3-phase

Frequently Asked Questions about HPE G2 Metered 3-Phase 22kVA 60A 480V 48-Outlet Rack PDU

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.