Brand: Eaton | Category: Rack PDUs
SKU: EAB303-10 | Part #: EAB303-10 | MPN: EAB303-10
Contact for Pricing — Request a Quote
The Eaton ePDU G3 Advanced EAB303-10 combines zero-U mounting with switched outlet control and metering, supporting automated power sequencing in multi-circuit racks.
Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 48 hours with confirmed competitive quoting, availability, and matching support contract options.
Request a Quote →Product information is provided for B2B procurement guidance. All trademarks are property of their respective owners.
| Brand | Eaton |
| Category | Rack PDUs |
| SKU | EAB303-10 |
| Part Number | EAB303-10 |
| Condition | New |
| Communication | USB, RS-232, SNMP / NMC card |
| Manufacturer Part Number | EAB303-10 |
| Product Type | Advanced Rack PDU |
| Form Factor | 0U Rack |
| Input Voltage | 120V AC single-phase |
| Input Connector | NEMA 5-15P |
| Outlet Configuration | (3)C13 outlets |
| Communication Interface | USB, RS-232, SNMP |
| Management Card | Optional NMC card |
| Current Rating | 15A |
| Operating Temperature | 0–40°C |
| Humidity Range | 10–90% non-condensing |
| Dimensions | 1.75 x 12.75 x 2.5 inches |
| Weight | 2.2 kg |
| Metering Capability | Per-outlet metering with advanced monitoring |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.