Brand: Eaton | Category: UPS & Power Protection
SKU: 9PX11K3PHLI | Part #: 9PX11K3PHLI | MPN: 9PX11K3PHLI
Contact for Pricing — Request a Quote
The Eaton 9PX 11000VA 3-Phase Li-Ion UPS is a tower-form-factor system engineered for mission-critical environments requiring extended runtime and rapid battery recovery. Operating as a double-conversion online topology, this unit delivers 11000 VA and 10000 W across 3-phase input and output configurations, supporting nominal voltages of 380 / 400 / 415 V AC with auto-sensing frequency adjustment between 50 / 60 Hz. The lithium-ion battery technology enables full recharge to 90% capacity in approximately 1.5 hours from complete discharge—a critical advantage when rapid site recovery is mandated. Part number 9PX11K3PHLI represents Eaton's commitment to delivering true online power protection with a 0.91 output power factor, ensuring efficient load delivery across modern three-phase enterprise infrastructure.
Data centre operations teams, IT infrastructure engineers, and enterprise procurement departments select this UPS when downtime risk must be eliminated and battery lifecycle costs demand reduction. The Eaton 9PX Li-Ion series integrates with Eaton Intelligent Power Manager (IPM) and Eaton Power Xpert Software, enabling centralized monitoring and predictive maintenance through USB, RS-232, and optional SNMP/Modbus network card interfaces. The unit operates reliably across 0 °C to 40 °C ambient conditions with 0–95% non-condensing relative humidity, meeting the thermal envelope of containerized and traditional raised-floor data centres. Storage flexibility spans -25 °C to 60 °C, supporting both active deployment and extended warehouse holding without battery degradation.
Omnixon Global stocks the 9PX11K3PHLI and maintains direct relationships with Eaton regional distribution to support enterprise-scale deployments across the UAE and GCC markets. Whether you require single-unit protection or multi-unit configurations for redundant power architecture, our technical team can validate load compatibility, design integration pathways, and coordinate logistics. Contact Omnixon Global to submit an RFQ and discuss your three-phase UPS requirements with our specialists.
| Brand | Eaton |
| Category | UPS & Power Protection |
| SKU | 9PX11K3PHLI |
| Part Number | 9PX11K3PHLI |
| Condition | New |
| Manufacturer Part Number | 9PX11K3PHLI |
| Series | Eaton 9PX Li-Ion |
| UPS Topology | Double-conversion online (true online) |
| VA Rating | 11000 VA |
| Watt Rating | 10000 W |
| Power Factor (Output) | 0.91 |
| Input Phase Configuration | 3-phase |
| Output Phase Configuration | 3-phase |
| Input Voltage (Nominal) | 380 / 400 / 415 V AC (3-phase) |
| Output Voltage (Nominal) | 380 / 400 / 415 V AC (3-phase) |
| Output Frequency | 50 / 60 Hz (auto-sensing) |
| Battery Technology | Lithium-Ion (Li-Ion) |
| Battery Recharge Time (to 90%) | Approximately 1.5 hours (from full discharge) |
| Communication Interfaces | USB, RS-232, dry contacts; optional SNMP/Modbus network card |
| Software Compatibility | Eaton Intelligent Power Manager (IPM), Eaton Power Xpert Software |
| Operating Temperature | 0 °C to 40 °C |
| Storage Temperature | -25 °C to 60 °C |
| Relative Humidity (Operating) | 0–95% non-condensing |
| Form Factor | Tower (rack-convertible) |
| Standards / Certifications | IEC 62040-1, IEC 62040-2 (Class C2 / VFI-SS-111) |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.