Schneider Electric APC Rack PDU, Advanced Metering, ZeroU, 32A/415V, 3PH, (3) C19 & (18) C13 AP8663

Schneider Electric APC Rack PDU, Advanced Metering, ZeroU, 32A/415V, 3PH, (3) C19 & (18) C13 AP8663

Brand: APC | Category: Rack PDUs

SKU: AP8663 | Part #: AP8663 | MPN: AP8663

Contact for Pricing — Request a Quote

Request a Quote Contact Us

About the Schneider Electric APC Rack PDU, Advanced Metering, ZeroU, 32A/415V, 3PH, (3) C19 & (18) C13 AP8663

The AP8663 is a ZeroU advanced-metered PDU running 32A/415V three-phase, with 18 C13 and 3 C19 outlets for precision power monitoring in dense racks.

At a glance — key specifications

Form FactorRack
Part NumberAP8663
ManufacturerAPC
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery

Perfect for

  • Server racks (single or paired)
  • Network and storage closets
  • Edge / branch IT
  • Small to mid-size datacentre rooms
  • Critical workstations and lab equipment

Why buy the Schneider Electric APC Rack PDU, Advanced Metering, ZeroU, 32A/415V, 3PH, (3) C19 & (18) C13 AP8663 from Omnixon Global

  • Authorised distribution only — 100% authentic APC hardware, serial-number registrable, warranty processes cleanly with the manufacturer.
  • Dubai-based logistics hub — same-day delivery within Dubai for in-stock SKUs, courier-cleared delivery across UAE, Saudi Arabia, Qatar, Kuwait, Oman, Bahrain, plus broader EMEA + APAC.
  • 24-hour RFQ turn-around — submit your part numbers and quantities, get channel-direct pricing and confirmed availability the next business day.
  • Pre-sales engineering on call — multilingual (English / Arabic / Persian / Russian) pre-sales engineers help with sizing, configuration, BOM validation, and compatibility checks at no charge.
  • Post-sale support attach — manufacturer support contracts (Dell ProSupport, HPE Foundation Care, Lenovo Premier, Cisco SmartNet, Aruba Care, Juniper J-Care) bundled at quote time.
  • Worldwide shipping — air, sea, courier express, with all customs documentation handled by our logistics team.

Frequently asked questions

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.

Request a quote for the Schneider Electric APC Rack PDU, Advanced Metering, ZeroU, 32A/415V, 3PH, (3) C19 & (18) C13 AP8663

Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.

Request a Quote →

Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.

Technical Specifications

BrandAPC
CategoryRack PDUs
SKUAP8663
Part NumberAP8663
ConditionNew
Form FactorRack
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery
Manufacturer Part NumberAP8663
Input Voltage415V 3-Phase
Input Current Rating32A
Outlet Configuration3x C19 & 18x C13
Total Outlet Count21
Maximum Power Distribution22.4 kVA
Metering CapabilityAdvanced Metering
Management InterfaceSNMP, USB, RS-232
Network Management CardOptional NMC
Dimensions (H x W x D)44 x 90 x 113 mm
Weight2.1 kg
Operating Temperature Range0–40°C

Frequently Asked Questions about Schneider Electric APC Rack PDU, Advanced Metering, ZeroU, 32A/415V, 3PH, (3) C19 & (18) C13 AP8663

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.