Brand: Eaton | Category: Rack PDUs
SKU: 3MA32ELUVAAGJN | Part #: 3MA32ELUVAAGJN | MPN: 3MA32ELUVAAGJN
Contact for Pricing — Request a Quote
The Eaton ePDU G3 3MA32ELUVAAGJN brings advanced metered 3-phase 32A 208V input monitoring to high-density datacentre racks requiring granular power visibility.
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.
Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.
Request a Quote →Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.
| Brand | Eaton |
| Category | Rack PDUs |
| SKU | 3MA32ELUVAAGJN |
| Part Number | 3MA32ELUVAAGJN |
| Condition | New |
| Battery | Sealed lead-acid or Li-ion (model-dependent) |
| Communication | USB, RS-232, SNMP / NMC card |
| Warranty | 2-3 year electronics + 2 year battery |
| Manufacturer Part Number | 3MA32ELUVAAGJN |
| Form Factor | Rack PDU |
| Product Line | ePDU G3 |
| Input Phase | Three Phase |
| Outlet Configuration | Advanced Metered |
| Number of Outlets | 36 |
| Input Voltage | 208V AC |
| Input Current Rating | 32A |
| Management Interface | Ethernet, USB, RS-232 |
| Protocol Support | SNMP |
| Metering Capability | Outlet and branch-level metering |
| Rack Units | 2U |
| Security Features | Remote outlet control and monitoring |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.