Brand: Eaton | Category: Rack PDUs
SKU: EMAB30A | Part #: EMAB30A | MPN: EMAB30A
Contact for Pricing — Request a Quote
The ePDU G3 Advanced 0U combines 208V/30A metered-by-outlet intelligence with 20xC13 and 4xC19 outlets for mixed-load rack power management.
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.
Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.
Request a Quote →Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.
| Brand | Eaton |
| Category | Rack PDUs |
| SKU | EMAB30A |
| Part Number | EMAB30A |
| Condition | New |
| Battery | Sealed lead-acid or Li-ion (model-dependent) |
| Communication | USB, RS-232, SNMP / NMC card |
| Warranty | 2-3 year electronics + 2 year battery |
| Form Factor | 0U Rack |
| Manufacturer Part Number | EMAB30A |
| Product Line | ePDU G3 |
| PDU Type | Advanced Metered-by-Outlet |
| Input Voltage | 208V AC |
| Input Current Rating | 30A |
| C13 Outlets | 20 |
| C19 Outlets | 4 |
| Per-Outlet Metering | Individual voltage, current, and power consumption per outlet |
| Communication Interfaces | USB, RS-232, SNMP |
| Management Card | NMC (Network Management Card) compatible |
| Operating Temperature | 0–40°C |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.