APC Smart-UPS SRT PDU, AP9565 Switched Rack PDU, 1U, 120V 15A (AP9565)

APC Smart-UPS SRT PDU, AP9565 Switched Rack PDU, 1U, 120V 15A (AP9565)

Brand: APC | Category: UPS & Power Protection

SKU: AP9565 | Part #: AP9565 | MPN: AP9565

Contact for Pricing — Request a Quote

Request a Quote Contact Us

About the APC Smart-UPS SRT PDU, AP9565 Switched Rack PDU, 1U, 120V 15A (AP9565)

The AP9565 is a 1U rack PDU delivering switched 120V/15A outlet-level control for remote power cycling and load monitoring in dense rack environments.

At a glance — key specifications

Form FactorRack
Part NumberAP9565
ManufacturerAPC
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery

Perfect for

  • Server racks (single or paired)
  • Network and storage closets
  • Edge / branch IT
  • Small to mid-size datacentre rooms
  • Critical workstations and lab equipment

Why buy the APC Smart-UPS SRT PDU, AP9565 Switched Rack PDU, 1U, 120V 15A (AP9565) from Omnixon Global

  • Authorised distribution only — 100% authentic APC hardware, serial-number registrable, warranty processes cleanly with the manufacturer.
  • Dubai-based logistics hub — same-day delivery within Dubai for in-stock SKUs, courier-cleared delivery across UAE, Saudi Arabia, Qatar, Kuwait, Oman, Bahrain, plus broader EMEA + APAC.
  • 24-hour RFQ turn-around — submit your part numbers and quantities, get channel-direct pricing and confirmed availability the next business day.
  • Pre-sales engineering on call — multilingual (English / Arabic / Persian / Russian) pre-sales engineers help with sizing, configuration, BOM validation, and compatibility checks at no charge.
  • Post-sale support attach — manufacturer support contracts (Dell ProSupport, HPE Foundation Care, Lenovo Premier, Cisco SmartNet, Aruba Care, Juniper J-Care) bundled at quote time.
  • Worldwide shipping — air, sea, courier express, with all customs documentation handled by our logistics team.

Frequently asked questions

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.

Request a quote for the APC Smart-UPS SRT PDU, AP9565 Switched Rack PDU, 1U, 120V 15A (AP9565)

Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.

Request a Quote →

Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.

Technical Specifications

BrandAPC
CategoryUPS & Power Protection
SKUAP9565
Part NumberAP9565
ConditionNew
Form FactorRack
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery
Manufacturer Part NumberAP9565
Input Voltage120V
Input Current Rating15A
Outlet ConfigurationNEMA 5-15R (model-dependent)
Communication InterfaceUSB, RS-232, SNMP
PDU TypeSwitched / Metered
Maximum Power Capacity1.8 kW (120V 15A)
Outlet SwitchingIndividual outlet control
ManagementAPC Integrated Switched PDU Console
Monitored ParametersVoltage, current, power consumption
Operating Temperature0–40°C

Frequently Asked Questions about APC Smart-UPS SRT PDU, AP9565 Switched Rack PDU, 1U, 120V 15A (AP9565)

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.