Brand: APC | Category: Rack PDUs
SKU: APDU10350SM3332 | Part #: APDU10350SM3332 | MPN: APDU10350SM3332
Contact for Pricing — Request a Quote
The APDU10350SM3332 delivers 22kW at 415V three-phase with per-outlet switching and metering for precision power control in enterprise datacentres.
Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 48 hours with confirmed competitive quoting, availability, and matching support contract options.
Request a Quote →Product information is provided for B2B procurement guidance. All trademarks are property of their respective owners.
| Brand | APC |
| Category | Rack PDUs |
| SKU | APDU10350SM3332 |
| Part Number | APDU10350SM3332 |
| Condition | New |
| Form Factor | Rack |
| Communication | USB, RS-232, SNMP / NMC card |
| Manufacturer Part Number | APDU10350SM3332 |
| Input Voltage | 380–415V AC |
| Input Current Rating | 32A |
| Phase Configuration | 3-Phase |
| Outlet Count | 24 |
| Outlet Type | C13 / C19 (mixed) |
| Switching Capability | Switched (individual outlet control) |
| Metering | Metered-by-outlet |
| Power Capacity | 22 kW |
| Management Interface | Ethernet RJ45 |
| Protocol Support | SNMP, HTTP/HTTPS |
| Advanced Management | APC Rack PDU App |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.