Brand: APC | Category: Rack PDUs
SKU: AP7932B | Part #: AP7932B | MPN: AP7932B
Contact for Pricing — Request a Quote
The AP7932B delivers Zero-U switched, metered-by-outlet PDU control, letting data centre teams remotely cycle individual outlets and track real-time load.
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.
Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.
Request a Quote →Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.
| Brand | APC |
| Category | Rack PDUs |
| SKU | AP7932B |
| Part Number | AP7932B |
| Condition | New |
| Form Factor | Rack |
| Battery | Sealed lead-acid or Li-ion (model-dependent) |
| Communication | USB, RS-232, SNMP / NMC card |
| Warranty | 2-3 year electronics + 2 year battery |
| Manufacturer Part Number | AP7932B |
| Product Type | Metered-by-Outlet Rack PDU with Switching |
| Design | ZeroU (vertical mounting) |
| Input Voltage | 120V AC (single-phase, 20A) |
| Rated Current | 20A |
| Maximum Power Capacity | 2.4 kW |
| Outlet Count | 8 × NEMA 5-15R |
| Switching Capability | Individual outlet on/off control |
| Metering | Per-outlet real-time power monitoring |
| Communication Protocol | USB, RS-232, SNMP |
| Network Interface | 10/100 Base-T Ethernet |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.