APC by Schneider Electric Rack PDU 2G, Metered-by-Outlet, ZeroU, 20A, 208V, (21)C13 & (3)C19

APC by Schneider Electric Rack PDU 2G, Metered-by-Outlet, ZeroU, 20A, 208V, (21)C13 & (3)C19

Brand: APC | Category: Rack PDUs

SKU: AP8459NA3 | Part #: AP8459NA3 | MPN: AP8459NA3

Contact for Pricing — Request a Quote

Request a Quote Contact Us

About the APC by Schneider Electric Rack PDU 2G, Metered-by-Outlet, ZeroU, 20A, 208V, (21)C13 & (3)C19

The AP8459NA3 ZeroU metered-by-outlet PDU delivers 20A at 208V across 21 C13 and 3 C19 outlets with per-outlet consumption visibility in space-constrained racks.

At a glance — key specifications

Form FactorRack
Part NumberAP8459NA3
ManufacturerAPC
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery

Perfect for

  • Server racks (single or paired)
  • Network and storage closets
  • Edge / branch IT
  • Small to mid-size datacentre rooms
  • Critical workstations and lab equipment

Why buy the APC by Schneider Electric Rack PDU 2G, Metered-by-Outlet, ZeroU, 20A, 208V, (21)C13 & (3)C19 from Omnixon Global

  • Authorised distribution only — 100% authentic APC hardware, serial-number registrable, warranty processes cleanly with the manufacturer.
  • Dubai-based logistics hub — same-day delivery within Dubai for in-stock SKUs, courier-cleared delivery across UAE, Saudi Arabia, Qatar, Kuwait, Oman, Bahrain, plus broader EMEA + APAC.
  • 24-hour RFQ turn-around — submit your part numbers and quantities, get channel-direct pricing and confirmed availability the next business day.
  • Pre-sales engineering on call — multilingual (English / Arabic / Persian / Russian) pre-sales engineers help with sizing, configuration, BOM validation, and compatibility checks at no charge.
  • Post-sale support attach — manufacturer support contracts (Dell ProSupport, HPE Foundation Care, Lenovo Premier, Cisco SmartNet, Aruba Care, Juniper J-Care) bundled at quote time.
  • Worldwide shipping — air, sea, courier express, with all customs documentation handled by our logistics team.

Frequently asked questions

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.

Request a quote for the APC by Schneider Electric Rack PDU 2G, Metered-by-Outlet, ZeroU, 20A, 208V, (21)C13 & (3)C19

Submit your quantity, destination country, and required lead time below. Our pre-sales team responds within 24 business hours with confirmed channel pricing, availability, and matching support contract options.

Request a Quote →

Product information is provided for B2B procurement guidance. Pricing and availability subject to vendor confirmation at quote time. All trademarks are property of their respective owners. Omnixon Global is an independent authorised reseller — not affiliated with the manufacturer.

Technical Specifications

BrandAPC
CategoryRack PDUs
SKUAP8459NA3
Part NumberAP8459NA3
ConditionNew
Form FactorRack
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery
Manufacturer Part NumberAP8459NA3
Input Voltage208V, single-phase
Input Current Rating20A
Outlet Configuration(21)C13 & (3)C19
Total Outlet Count24
Communication InterfaceUSB, RS-232, SNMP / NMC card
MeteringMetered-by-Outlet
Network ManagementSNMP, web browser, telnet, SSH
Environmental MonitoringTemperature and humidity sensors supported
Power Capacity4.16 kVA

Frequently Asked Questions about APC by Schneider Electric Rack PDU 2G, Metered-by-Outlet, ZeroU, 20A, 208V, (21)C13 & (3)C19

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.