Brand: Vertiv | Category: UPS & Power Protection
SKU: NXC-080K-TF3-E | Part #: NXC-080K-TF3-E | MPN: NXC-080K-TF3-E
Contact for Pricing — Request a Quote
The Vertiv Liebert NXC UPS 80kVA Three-Phase (part number NXC-080K-TF3-E) features three-phase input and output connections designed for enterprise data center environments, with an input voltage range of 320–480V AC that accommodates most regional power infrastructures without requiring battery discharge during minor voltage fluctuations.
This Vertiv double-conversion online UPS delivers 80,000 VA (72,000 W) of continuous power at 0.9 output power factor, employing VFI (Voltage and Frequency Independent) topology to ensure zero transfer time from utility to inverter mode. The unit accepts nominal 400V AC three-phase input across 40–70 Hz input frequency range with auto-sensing capability, while maintaining nominal 400V AC three-phase output at ±1% voltage regulation and 50 or 60 Hz ± 0.1 Hz output frequency. The IGBT rectifier achieves greater than 0.99 input power factor at full load with input current THD below 3%, making it highly efficient for facilities requiring stringent power quality standards. IT procurement teams and infrastructure engineers across financial services, telecommunications, and critical-infrastructure sectors select Vertiv solutions when mission-critical systems demand uninterruptible power with minimal harmonic distortion and frequency independence.
Whether you are planning a new data center deployment or upgrading existing power protection capacity, the Liebert NXC 80kVA Three-Phase represents enterprise-grade redundancy backed by Vertiv's heritage in thermal and power management. Contact Omnixon Global today to request a detailed quotation for the NXC-080K-TF3-E and explore financing, integration support, and regional warranty options tailored to your organization's requirements.
| Brand | Vertiv |
| Category | UPS & Power Protection |
| SKU | NXC-080K-TF3-E |
| Part Number | NXC-080K-TF3-E |
| Condition | New |
| Model | Liebert NXC 80kVA |
| Manufacturer Part Number | NXC-080K-TF3-E |
| UPS Topology | Double-conversion online (VFI, Voltage and Frequency Independent) |
| Power Rating (VA) | 80,000 VA |
| Power Rating (Watts) | 72,000 W |
| Output Power Factor | 0.9 |
| Input Phase Configuration | Three-phase |
| Output Phase Configuration | Three-phase |
| Nominal Input Voltage | 400V AC three-phase |
| Input Voltage Range | 320–480V AC (without battery discharge) |
| Nominal Output Voltage | 400V AC three-phase |
| Output Voltage Regulation | ±1% |
| Nominal Input Frequency | 50/60 Hz |
| Input Frequency Range | 40–70 Hz (auto-sensing) |
| Output Frequency | 50 or 60 Hz ± 0.1 Hz (inverter mode) |
| Input Power Factor | >0.99 at full load (with IGBT rectifier) |
| Input Current THD | <3% at full load |
| Transfer Time (Bypass to Inverter) | 0 ms (true online, no transfer time) |
| Efficiency (Online Mode) | Up to 96% |
| Parallel Capability | Up to 4 units in parallel for capacity or redundancy |
| Communication Interfaces | RS-232, dry contacts, optional SNMP/Web card |
| Protection Features | Overload protection, short-circuit protection, over-temperature protection, battery deep discharge protection |
| Bypass | Integrated static bypass and manual maintenance bypass |
Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.
Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.
For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.
Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.