Eaton 93PM 30-100kW 3-Phase Modular UPS

Eaton 93PM 30-100kW 3-Phase Modular UPS

Brand: Eaton | Category: UPS & Power Protection

SKU: ETN-93PM100 | Part #: ETN-93PM100 | MPN: ETN-93PM100

Contact for Pricing — Request a Quote

Request a Quote Contact Us

About the Eaton 93PM 30-100kW 3-Phase Modular UPS

The Eaton 93PM 30-100kW 3-Phase Modular UPS from Eaton is enterprise-grade UPS & Power Protection hardware built for data centers. Eaton 93PM 30-100kW 3-Phase Modular UPS — premium Eaton ups & power protection for enterprise IT, datacenter, and AI workloads. Available now from Omnixon Global with worldwide shipping and Dubai-based fulfillment for UAE, GCC, EMEA, and APAC buyers. Available in brand new condition. Eaton ups & power protection products are trusted by enterprises and data centers worldwide. Available from Omnixon Global. Contact our sales team to request a quote.

Technical Specifications

BrandEaton
CategoryUPS & Power Protection
SKUETN-93PM100
Part NumberETN-93PM100
ConditionNew
BatterySealed lead-acid or Li-ion (model-dependent)
CommunicationUSB, RS-232, SNMP / NMC card
Warranty2-3 year electronics + 2 year battery

Frequently Asked Questions about Eaton 93PM 30-100kW 3-Phase Modular UPS

How long will this UPS run my load?

Runtime is load-dependent. Most enterprise UPS at 50% load deliver 8-12 minutes battery on standard internal batteries. Add external battery packs (XL / RBC modules) to extend to 30-60 minutes if you need ride-through past short utility blips.

Can it integrate with VMware vCenter / Veeam for graceful shutdown?

Yes — we ship the SNMP / Network Management Card (NMC) alongside the UPS, plus shutdown agents that integrate with VMware PowerChute, Veeam, NetApp ONTAP, and standard SNMP traps for orchestration platforms.

Do you provide installation and battery disposal?

For Dubai and the wider UAE we offer installation, commissioning, and battery recycling per municipality regulations. For broader GCC we partner with local certified electricians and recyclers — included as an option in the quote.

What is the lead time on larger 10-20 kVA models?

Stocked tier (under 10 kVA): 5-7 business days. 10-20 kVA: 2-4 weeks typically. 20+ kVA modular / parallel systems: 6-10 weeks vendor-side, plus on-site commissioning scheduling. Real numbers quoted with every order.